Museum staff member accessing PowerShelter e-bike battery charging locker with staff badge at national heritage institution
Museum staff member accessing PowerShelter e-bike battery charging locker with staff badge at national heritage institution

Amsterdam Museum: Fire-Safe E-Bike Charging for Heritage Sites

Amsterdam Museum: Fire-Safe E-Bike Charging for Heritage Sites

Amsterdam Museum: Fire-Safe E-Bike Charging for Heritage Sites

Client

Leading National Art & Heritage Institution (First museum with a BREEAM-NL 5-star rating)

Hardware
  • PowerShelter charging unit

  • Internal thermal containment & weather-resistant construction

  • Custom aesthetic finish

Users
  • Museum staff & technical teams

  • Frictionless entry via existing staff badges

Impact
  • Reinforced site safety standards with 100% adoption rate

Results
  • Unit at full capacity within three days of installation

“At an institution of this calibre, safety isn't just a checkbox. It's about preserving history. This solution allowed the site to support e-mobility without compromising its primary mission of preservation."

- National Heritage Institution, Amsterdam

Protecting National Heritage While Powering Sustainable Commutes

Protecting National Heritage While Powering Sustainable Commutes

CHALLENGE: The Art of Risk Management

Holding a BREEAM-NL 5-star rating for building management, this Amsterdam-based national heritage institution maintains rigorous environmental and safety standards. Supporting e-mobility was a logical step in its sustainability mission, but the operational reality posed a severe risk.

The building houses irreplaceable masterpieces by Rembrandt, Van Gogh and Vermeer. Bringing lithium-ion batteries indoors for charging was strictly incompatible with the institution's fire safety protocols. The Technical Supervisor needed a solution that would support green commuting without compromising the safety of the collection or the site's unique atmosphere.

SOLUTION: Fire Safety in Plain Sight

PowerShelter installed a charging unit with active fire suppression, moving the risk profile outside the building while maintaining the visual standards of the premium location.

  • Active Fire Suppression: The unit is engineered to detect and suppress thermal events instantly, ensuring that a battery failure never threatens the historic surroundings.

  • Custom Aesthetic Finish: To respect the site's unique atmosphere, the hardware was delivered with a custom finish, allowing the charging unit to blend into the staff zones without looking like an industrial addition.

  • Building Management Approved: The installation was reviewed and signed off by the institution's Building Management team, meeting their technical and safety requirements.

IMPACT: Instant demand

Staff uptake told the real story.

  • 100% Adoption Rate: Within three days of installation, the unit reached full capacity, validating the latent demand among employees.

  • Indoor Risk Mitigated: By providing a designated, fire-suppressed exterior zone, the institution moved battery charging away from interior galleries, ensuring staff e-bike commutes no longer pose a thermal risk to the collection.

  • Scaled Success: The initial installation was so successful that a second unit has since been ordered to double capacity.

Staff uptake told the real story.

  • 100% Adoption Rate: Within three days of installation, the unit reached full capacity, validating the latent demand among employees.

  • Indoor Risk Mitigated: By providing a designated, fire-suppressed exterior zone, the institution moved battery charging away from interior galleries, ensuring staff e-bike commutes no longer pose a thermal risk to the collection.

  • Scaled Success: The initial installation was so successful that a second unit has since been ordered to double capacity.

KEY TAKEAWAY: Sustainable Commuting Shouldn't Put Priceless Art at Risk. Now It Doesn't.

This institution didn't have to choose between fire safety and supporting its staff's green commutes. A single PowerShelter unit, custom finished, fire-suppressed, and validated against safety requirements, solved both. Full capacity within the first three days, now with a second unit on order.

owerShelter e-bike battery charging locker with custom aesthetic finish at national heritage institution Amsterdam
Museum staff member using RFID access card on PowerShelter e-bike battery charging locker
Staff member cycling to work on e-bike past national heritage institution in Amsterdam

Preserve your assets while powering your people.

Preserve your assets while powering your people.

English

© 2025 PowerShelter B.V. / All Rights Reserved. / KvK: 90888189 / Developed in Amsterdam 🇳🇱

English

© 2025 PowerShelter B.V. / All Rights Reserved. / KvK: 90888189 / Developed in Amsterdam 🇳🇱

English

© 2025 PowerShelter B.V. / All Rights Reserved. / KvK: 90888189 / Developed in Amsterdam 🇳🇱

English

© 2025 PowerShelter B.V. / All Rights Reserved. / KvK: 90888189 / Developed in Amsterdam 🇳🇱